Wind Turbine Availability Should it be time or energy based? A Case Study in Ireland.

Typeset version

 

TY  - JOUR
  - Conroy, N.; Deane, J.P.; Ó Gallachóir, B.P.
  - 2011
  - November
  - Renewable Energy
  - Wind Turbine Availability Should it be time or energy based? A Case Study in Ireland.
  - Published
  - ()
  - 36
  - 11
  - 2967
  - 2971
  - doi:10.1016/j.renene.2011.03.044
DA  - 2011/11
ER  - 
@article{V116535119,
   = {Conroy, N. and  Deane, J.P. and  Ó Gallachóir, B.P.},
   = {2011},
   = {November},
   = {Renewable Energy},
   = {Wind Turbine Availability Should it be time or energy based? A Case Study in Ireland.},
   = {Published},
   = {()},
   = {36},
   = {11},
  pages = {2967--2971},
   = {doi:10.1016/j.renene.2011.03.044},
  source = {IRIS}
}
AUTHORSConroy, N.; Deane, J.P.; Ó Gallachóir, B.P.
YEAR2011
MONTHNovember
JOURNAL_CODERenewable Energy
TITLEWind Turbine Availability Should it be time or energy based? A Case Study in Ireland.
STATUSPublished
TIMES_CITED()
SEARCH_KEYWORD
VOLUME36
ISSUE11
START_PAGE2967
END_PAGE2971
ABSTRACT
PUBLISHER_LOCATION
ISBN_ISSN
EDITION
URL
DOI_LINKdoi:10.1016/j.renene.2011.03.044
FUNDING_BODY
GRANT_DETAILS